Factors that determine the minimum site size
Check the following before assuming a site size will work:
- Whether public mains water and sewer are available to connect to
- The county development plan's stated minimum site size for the relevant zoning or rural area type
- The results of a trial hole and percolation (T-value) test if a private wastewater system is needed
- Required separation distances between the treatment system, any well, watercourses and the boundary
- The site's shape and slope, which affect where the house and treatment area can practically go
- Whether a public or group water scheme connection is available as an alternative to a private well
A site suitability assessment carried out by a suitably qualified person is the definitive way to establish whether a specific rural site is large enough.
What it costs and how long it takes
A percolation and site suitability assessment is typically arranged with a qualified engineer or geologist and generally costs a modest fixed fee, with results available within a few weeks. It is best commissioned before finalising a site purchase, since an unfavourable result can affect both site size requirements and the design of the house.