What determines how much land you need
Work through these before assuming a site is big enough:
- Get a trial hole and percolation (T-test) assessment carried out by a suitably qualified person
- Confirm the percolation area size the soil result requires — poorer soils need proportionally more area
- Set aside a full reserve percolation area equal in size to the primary area
- Check setback distances to the house, boundary, any well, and watercourses
- Allow for tree and hedgerow root zones near the percolation area
- Consider slope and groundwater level, which can rule out gravity percolation systems
- Factor in access for a desludging tanker
- If land is tight, price a proprietary secondary treatment system, which can need a smaller polishing filter area than a traditional percolation area
A site suitability assessment carried out alongside a planning application is the definitive way to establish the minimum area your specific site needs.
When to get a professional assessment
Before buying a site or lodging a planning application for a one-off house, commission a site suitability assessment from a suitably qualified engineer or geologist. Local authorities require this as part of a planning application in areas without a public sewer, and it is the only reliable way to know whether a specific plot can support a compliant wastewater system.